Home / The Hub

Erisha Smart Manufacturing Hub

A 335-acre, 25 million sq ft integrated industrial city in the Al Ghail Industrial Zone, RAKEZ — where manufacturing, logistics, innovation and daily life are designed to operate together.

335Acres, RAKEZ Al Ghail
25MSq ft development
200Permitted activities
3Delivery phases
100%Foreign ownership

Concept

An industrial city, not an industrial park

World-class manufacturing ecosystems are no longer defined only by factories and infrastructure. They are defined by their ability to attract and retain talent, reduce friction in daily operations, and sustain productivity over long investment horizons.

Erisha is planned so that manufacturing facilities sit alongside suppliers, testing environments, training institutions, housing, retail and services. That integration compresses timelines and lets advanced manufacturing programmes scale without relocation, disruption or loss of workforce continuity.

Residential, retail and hospitality uses here are enabling infrastructure for an export-oriented, talent-driven manufacturing ecosystem — deliberately designed to serve manufacturing first, not speculative real estate.

The integrated ecosystem

Five systems, engineered to reinforce each other

Manufacturing

Production at platform level

20+ turnkey industries at Phase I; EV, hydrogen and semiconductor clusters; advanced logistics, R&D and smart automation across the campus.

Living

Workforce stability

Managed residential formats for skilled, technical and management tiers, delivered in employment-led phases rather than speculative releases.

Innovation

Test before you scale

Semiconductor cleanrooms, the EV battery gigafactory, eVTOL prototype testing zones and shared R&D infrastructure.

Services

Daily operations, on campus

Hospital and medical college, private school campus, business hotels, hypermarket, retail and dining sized to the campus population.

Sustainability

Net Zero construction

Renewable-ready power grid, 5G and IoT digital backbone, greywater recycling, circular manufacturing and carbon credit generation.

Governance

Single master developer

Rana Exim FZ-LLC coordinates design, approvals, infrastructure and construction, removing the fragmented interfaces that delay industrial projects.

Masterplan

Land use across the three phases

Phase I and II occupy the southern industrial parcels along the main arteries. Phase III carries the mixed-use core — education, residential, hotels, hospital, R&D, warehousing and the non-free-zone industrial band.

Erisha Smart Manufacturing Hub masterplan showing Phase I, Phase II and Phase III land allocation

Drawing reference: Erisha Smart Manufacturing Hub general layout, Al Ghail Industrial Zone. Indicative, subject to authority approval.

Development roadmap

Scalable from day one

Phase 1 · 2025–2027

Foundation & early revenue

Core infrastructure — roads, utilities, digital backbone. Delivery of 20 turnkey manufacturing units pre-aligned to EV, logistics and renewable sectors. First lifestyle and residential blocks for workforce integration.

Phase 2 · 2027–2028

Scale-up & high-tech anchors

Semiconductor cleanrooms and EV battery gigafactory commissioning. Expansion of lifestyle components — schools, retail, healthcare. Integration of AI-enabled smart logistics hubs.

Phase 3 · 2029 onward

Full build-out & future technology

Hydrogen vehicle manufacturing and eVTOL prototype testing zones. Completion of the mixed-use ecosystem — universities, R&D hubs, hotels, hospital and shopping complexes. Export scale-up aligned with UAE–India CEPA and African corridors.

A father and child looking out over a green industrial campus of the future

Building for the next generation — Erisha campus concept.

Phasing logic

  • De-risked — early anchor tenants validate the ecosystem
  • Scalable — each phase adds higher-value industries
  • Flexible — allows JV, co-investment and operator partnerships

ESG & sustainability

Net Zero is the specification, not the marketing

Every asset is engineered with ESG compliance, digital infrastructure and future scalability from day one.

Construction

Net Zero standard

All buildings delivered to Net Zero standards. Greywater recycling, renewable-ready grid and green mobility infrastructure throughout the hub.

Energy

Clean energy integration

Solar, hydrogen and storage ready, with a 5G/IoT backbone. Energy generated within Erisha powers Erisha operations.

Circularity

Circular manufacturing

Waste-to-energy, resource optimisation and carbon credit generation embedded in the masterplan.

Community

Jobs & community

4,000 direct and 20,000+ indirect jobs, with workforce housing, schools and a hospital inside the hub.

Economy

GDP contribution

Targeting USD 5–6 billion per annum contribution to UAE GDP at stabilisation, aligned to Operation 300bn.

Trade

UAE–India CEPA bridge

A production gateway for South Asian manufacturers serving GCC, African and global markets under preferential tariff treatment.